MSD SLUICE GATE REPLACEMENT PROJECTS
At an extremely remote site, E-Z Construction successfully installed a 25-ton sluice gate 45’ underground and a second gate immediately beneath the I-64 overpass.
The work required bypass of flow within a 10’ diameter storm outflow pipe systems to the Ohio River. The embedded cast iron frame was cut out and the new frames were installed while safety confined space monitoring and constant safety inspections protected our workers. Gate actuators, rising stems and stem guides required precise installation and alignment.
AT A GLANCE
KEY ELEMENTS
- Monitor confined spaces
- Install 25-ton sluice gate 45’ below ground
- Maintain flow control during installation
- Gate actuators and stem guides
GET IN TOUCH!
7420 Distribution Drive
Louisville, KY 40258
PHONE: 502.937.6855
Site Map
Site Info
Privacy Policy
7420 Distribution Drive
Louisville, KY 40258
PHONE: 502.937.6855
Site Map
Site Info
Privacy Policy